出 处:《热力发电》2008年第9期71-74,共4页Thermal Power Generation
摘 要:根据福建电网一次调频运行管理要求,以某电厂396MW机组为例,对其一次调频存在的调频响应缓慢、调频幅度与设定值偏差较大等问题进行优化。实际应用表明,优化后的一次调频功能基本满足电网调频要求。Based on requirements in operation management of primary frequency modulation for Fujian Power Grid, taking 396 MW units in one power plant as example,the problems existing in its primary frequency modulation,such as slow response for the frequency modulation, comparatively large deviation in amplitude of frequency modulation and in set value etc. have been optimized. Practical application shows that the primary frequency modulation function after optimization can basically satisfy the requirements of frequency modulation in the power grid.
关 键 词:发电厂 396MW机组 一次调频 控制 DEH UCC
分 类 号:TK323[动力工程及工程热物理—热能工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145