检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王建国[1]
出 处:《中国市政工程》2008年第2期65-67,共3页China Municipal Engineering
摘 要:叙述了土压平衡顶管机在复杂地层水下施工所采取的技术措施,对施工中1号顶管机出现突沉事故作了分析。介绍了排除风险的具体方案及过程,从而进一步认识到顶管机的选型、土体改良、掌握工程地质资料及工程范围内土层扰动历史的重要性。Described hereby are the technical measures taken in underwater construction in complicated strata with the earth pressure balanced pipejacking machine, with analysis of the accident of No.1 Pipejacking Machine's sudden sinking, and the specific method and process for eliminating the risk. Thus, the importance is further realized, such as the type selection of the machine, soil modification and availability of geological information and history of soil disturbance within the range of works.
分 类 号:U455.47[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28