检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:左丽萍[1]
机构地区:[1]江西理工大学,江西赣州341000
出 处:《商品储运与养护》2008年第8期82-83,共2页Storage Transportation & Preservation of Commodities
摘 要:工程量清单报价是建设工程施工招投标时,投标人依据招标人提供的工程量清单,分别报出综合单价并以合理最低总价中标的工程造价计价模式。费用由分部分项工程费、措施项目费、其他项目费、规费和税金几部分组成;报价书要用《清单计价规范》中统一格式编制。The resilience detailed list quoted price is such a project construction cost and valuation model. When construction project bid is happen, renderers give the comprehensive unit price distinctively according to resilience detailed list offered by bidder and become a successful bidder in the minimum reasonable price. The complete expense is composed by the branch sub-item engineering cost , the measure project spends, other project expense, gauge expense as well as tax money. Quoted price book should be compiled in the form consistent with "standards of detailed list valuation".
分 类 号:TU723[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28