不确定性资源约束下的跨企业协同计划问题  被引量:4

Cross-enterprise collaborative planning constrained by uncertain resources

在线阅读下载全文

作  者:何霆[1] 武冬冬[1] 徐晓飞[1] 张宏国[1] 

机构地区:[1]哈尔滨工业大学计算机科学与技术学院,哈尔滨150001

出  处:《哈尔滨工业大学学报》2008年第7期1089-1093,共5页Journal of Harbin Institute of Technology

基  金:国家863/CIMS主题资助项目(2006AA04Z1652007AA040804)

摘  要:针对复杂产品制造的跨企业生产计划管理特点,提出了项目管理与ERP结合的跨企业协同生产计划集成管理模式,针对复杂产品制造资源不确定的特点,提出了以交货期最短为目标,以不确定性资源为约束的跨企业协同生产计划算法.算例结果表明,该方法满足项目子任务的优先关系约束和不确定性资源的约束,验证了该方法的有效性.To meet the management demand of cross-enterprise on manufacturing complex products, a new integration management mode for cross-enterprise collaborative planning is proposed based on the integration of project management and ERP. An algorithm considering the goal of the earliset due date is developed to solve the project scheduling with the uncertain resource constrained. Calculation results of a relative case show that the proposed mode meets the prior restraint to subtasks and the constraint to uncertain resources, which verifies the validity of the developed algorithm.

关 键 词:跨企业协同生产计划 不确定性资源 协同生产计划算法 

分 类 号:TP391[自动化与计算机技术—计算机应用技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象