检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜寿兴
出 处:《建筑》2008年第16期6-15,共10页
摘 要:1993年,杭州湾跨海大桥工程进行前期论证;2003年11月17日下午1时30分,世界最长的跨海大桥—杭州湾跨海大桥在离海盐县西塘桥镇郑家埭6公里的海面上开始打下首根钢管桩。2007年6月26日下午3点40分,杭州湾跨海大桥全桥贯通;2008年5月1日下午3时40分,随着180辆仪仗车南北双向对开,杭州湾跨海大桥全线通车。十年磨一剑,大桥的建设者们创造了一个又一个奇迹。The Hangzhou Bay bridge project has been under the pre-phase argumentation since 1993. The longest sea-crossing bridge project——Hangzhou Bay Bridge was initiated at 13:30pm on November 17, 2003 with the first steel-pipe pile hammered in the sea at a distance of 6 kilometers away from Zhengjia Dam in Tangqiao Town of Haiyan County. The Bridge was linked at 15:26pm on June 26, 2007. Along with 180 vehicles as a guard of honor driving to the bridge in both directions, Hangzhou Bay Bridge was open to traffic at 15:40 on May 1st, 2008. The builders have created another miracle through hard work for ten years.
关 键 词:杭州湾跨海大桥 世界 跨海大桥工程 钢管桩 海盐县
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198