检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗剑波[1] 宣筱青[1] 任建锋[1] 邵俊松[1] 徐海波[1]
机构地区:[1]国网电力科学研究院,江苏省南京市210003
出 处:《电网技术》2008年第18期10-13,共4页Power System Technology
摘 要:晋东南—南阳—荆门交流1000kV特高压交流试验示范工程将于2008年内投运,作为该示范工程的配套项目,配置了4套UFV-200F失步解列装置,这是失步解列装置首次应用在特高压电网中。文章介绍了该装置在电力工业电力设备及仪表质量检验测试中心进行的动模试验,结果表明,该装置能够满足特高压电网的运行要求及相关的技术标准。The 1 000 kV AC power transmission test and demonstration project from southeast Shanxi province via Nanyang in Henan province to Jingmen in Hubei province will be put into operation in the year of 2008. As the supporting item, four sets of UFV-200F out-of-step separation devices are equipped. It is the first time to apply out-of-step separation device in UHVAC power network. The dynamic simulation tests for out-of-step separation devices are implemented in quality inspection and test center of power devices and instruments for power industry. Test results show that the UFV-200F out-of-step separation device can meet the demand of UHVAC power grid operation and conform to the relevant technological standards.
分 类 号:TM762[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7