机构地区:[1]中国电力科学研究院,北京市海淀区100192
出 处:《电网技术》2008年第18期92-95,102,共5页Power System Technology
摘 要:介绍了2008年3月21日北京电网220kV草桥变电站停电事故的发生经过,对事故相关的电力设备配置及运行情况进行了详细调查与分析,得出结论:气体绝缘金属封闭开关设备(gas insulated switchgear,GIS)电缆终端气室内GIS本体与电缆连接处安装不当从而引发绝缘破坏是导致本次事故的主要原因;鉴于高压开关设备在电网中的重要作用,现场安装是确保其整机性能的重要环节,对该环节应采取严格的质量控制。最后提出了避免该类事故发生的相关建议和整改措施。In this paper the process of blackout occurred in 220kV Caoqiao substation of Beijing power network in China on March 21, 2008 is presented. By means of detailed investigation and analysis on the configuration and operation condition of the power equipments relative to the fault, the conclusion is drawn that in the gas chamber of cable terminal the incorrect connection of the noumenon of gas insulated switchgear (GIS) with cable terminal which touches off destruction of insulation is the main reason leading to this accident. In view of the vital fianction of high voltage switchgears in power network, the field installation of high voltage switchgears is an important link to ensure the overall performance of GIS, thus strict quality control should be applied to this link. Finally some suggestions and reform measures to prevent this kind of accidents are proposed.
关 键 词:220KV变电站 气体绝缘金属封闭开关设备(GIS) 电缆终端 故障跳闸 停电事故
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117