检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:许岗[1]
机构地区:[1]北京铁路局建设管理处
出 处:《电气化铁道》2008年第5期16-20,共5页Electric Railway
摘 要:从分析高速客运专线牵引负荷特点入手,结合京津城际工程具体实践,分析了从高速牵引负荷引起的电压损失与系统短路容量的关系、电力系统的电压损失与系统短路容量的关系、高速牵引负荷引起的初步电压不平衡与系统短路容量的关系,得出电力系统短路容量与客运专线牵引变压器的电压损失无关、与电力系统电压损失成反比、与电压不平衡值成反比,从理论和远期规划上提出电力系统短路容量应满足4000MVA以上。Start from analysis of traction load characteristics of high speed passenger railway line, with reference of actual practice of Beijing-Tianjin passenger dedicated railway line, analyzes the relationship between voltage loss caused by high speed traction load and system short circuit capacitance, between voltage loss and system short circuit capacitance, between preliminary voltage unbalance caused by high speed traction load and system short circuit capacitance, obtains the conclusions that the power supply system short circuit capacitance has no relation with voltage loss of traction transformer of passenger dedicated railway line, and be in inverse ratio to voltage loss of power supply system and voltage unbalance value, puts forward that the short circuit capacitance of power supply system shall satisfy short circuit capacitance of 4 000 MVA in terms of theory and long term planning
分 类 号:U238[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.146