检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张铭[1] 李承军[1] 张勇传[1] 袁晓辉[1]
机构地区:[1]华中科技大学水电与数字化工程学院,湖北武汉430074
出 处:《华中科技大学学报(自然科学版)》2008年第9期25-28,共4页Journal of Huazhong University of Science and Technology(Natural Science Edition)
基 金:国家自然科学基金资助项目(50779020);国家重点基础研究发展计划资助项目(2007CB714107)
摘 要:为了在水电站水库优化调度中能对调度方案风险的大小进行量化,应用离散时间、非时齐马尔可夫决策过程,建立了水库中长期调度发电收益最小风险模型,以整个调度期发电收益未超过预先给定目标值的风险(概率)最小为优化准则.考虑到水电尽可能在高电价时段运行以获取更大利润,通过对电力系统的典型日负荷过程分析,确定水电厂时段收益电价与出力的函数关系.与期望发电效益最大模型相比,该模型适合需要对风险有直接限制的决策制定,以体现决策者的意愿或风险偏好.采用随机动态规划法对模型进行求解,并以三峡水电厂为实例,对所建立的模型进行检验,结果表明:该模型有利于水电厂调度人员作出风险决策,并实现水电厂的优化运行.In order to quantify the level of the risk for the hydropower scheduling, discrete time Markov decision process was studied and the minimum risk control model was established for the reservoir long-term generation optimization. The optimal scheduling criteria are the probability that the expected generation of the whole period not exceeding the pre-set generation target to be smallest. For the hydropower tends to operate as peak-clipping mode in market-based model to gain more profits, the function of electricity price and output can be founded by analyzing on the typical day load course of the electricity system. Compared with the generally used guidance of the largest expectation power generation model, this model is fitted for the decision-making in which the risk is needed to be limited to reflect the risk preference of the policy makers. Stochastic dynamic programming method is adopted to solve the model and the model is tested on the Three Gorges Hydropower Station. Results show that the model is conducive to get the risk decision-making and achieve the optimal operation of the hydropower station.
关 键 词:水库发电调度 电价 最优决策 风险偏好 马尔可夫决策过程 最小风险准则
分 类 号:TV679.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30