检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南昌大学建筑工程学院,江西南昌330031 [2]江西省水利科学研究院,江西南昌330029
出 处:《江西水利科技》2008年第3期164-167,共4页Jiangxi Hydraulic Science & Technology
摘 要:在水库汛限水位控制方法分类的基础上,结合相关研究成果,根据汛限水位控制方法的研究历程、时间序列对汛限水位静态控制和动态控制两种方法,进行介绍和分析,并对近年来新的研究成果加以综述,在两种基本方法上进行对比研究,从系统的角度分析影响汛限水位控制的因素.The way to determine the reservoir flood limit level was stated in this paper. Based on reservoir flood limit level's classification, static control method and dynamic control method are analyzed in the paper according to the times of study and the experts' conclusion. These two ways was deeply compared in this paper. And some new ways of reservoir flood limit level determi- nation was discussed. The key factors affecting the determination of flood limit level are analyzed from a systemic point and the final conclusions and evaluations are given.
关 键 词:水库汛期限制水位 静态控制 动态控制 洪水保证率
分 类 号:TV697.13[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195