检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]海南宏生勘测设计有限公司,海南海口570203 [2]华南理工大学土木与交通学院,广东广州510640
出 处:《水电能源科学》2008年第5期48-50,共3页Water Resources and Power
基 金:教育部新世纪优秀人才支持计划基金资助项目(NCET-05-0483);教育部科学技术研究基金资助重点项目(107135)
摘 要:分析不同分流比时的设计水面线,通过南渡江河口段分流口位置的设计水位确定较合适的分流比为8∶3。将该分流比情况下得到的分流口位置的设计水位与已有研究成果相比,可知本文计算出的设计水面线较为合理,能满足南渡江河口段整治的需要。Based on the former research results and the channel actual stare, the design water surface curve for each flow distributary proportion is calculated using the different assumption distributary proportion. The best ratio of distributary proportion is eight to three by design water level at the distributary mouth. The design water level at the distributary mouth is compared and analyzed with the former study results. The result indicates that the obtained result in the paper is reasonable, and it may satify the practical need of Nandujiang River mouth channel regulation.
关 键 词:南渡江出海口 横沟河段 频率组合法 水面线 分流比
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.196.112