新兴煤矿采空积水区下采煤的防水煤岩柱设计  被引量:3

Design of Waterproof Coal Rock Pillar Under Goaf Ponding District Mining in Xinxing Coal Mine

在线阅读下载全文

作  者:李君利[1] 仉连友[1] 刘志伟[2] 

机构地区:[1]中煤国际工程集团重庆设计研究院,重庆400016 [2]煤炭科学研究总院重庆研究院,重庆400037

出  处:《煤炭技术》2008年第10期51-53,共3页Coal Technology

摘  要:在采空积水区下采煤的防水煤岩柱设计关系到矿井的安全生产和资源开发的合理性,需要在一定的理论指导下完成。文章以新兴煤矿的延深设计为例,通过分析覆岩破坏规律,分别计算冒落带、裂隙带的最大高度和保护层高度,最终确定以+150^+180 m水平之间煤岩柱作为防水煤岩柱,并采取必要的开采技术措施,为±0m水平的安全开采提供了可靠的科学依据。Stagnant water in the mined - out area of coal mining under the waterproof design bearing rock mine production safety and resource development is reasonable, it is completed under the guidance of the theory. Taking the extension design in Xinxing Coal Mine as an example, by analyzing the destruction of cover rock, calculating the height of roof failing zone, fracture zone and protective layer, finally the coal rock pillar in the + 150- + 180 m level, is taken as the waterproof coal rock pillar. The essential mining technical measure is adopted. The reliable scientific basis is provided for ±0 m level safe mining.

关 键 词:新兴煤矿 防水煤岩柱 冒落带 导水裂隙带 保护层 

分 类 号:TD823.8[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象