检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《建筑技术》2008年第10期760-762,共3页Architecture Technology
摘 要:A380机库钢结构工程的安装测量控制主要从29.10m高的四肢格构式钢管柱的安装、4万m2超大面积钢屋盖的地面拼装、屋盖整体提升过程中的跟踪监测、合龙卸载后的挠度测量等方面,针对工程特点和难点,采取有针对性的测量控制措施,最终实现了工程目标,并通过了结构"长城杯"的验收。In A380 aircraft hangar steel structure project, relevant control measures are adopted according features and difficulties in installation of 29.10 m high d-limb lattice steel pipe column, assembly of super- large steel roof of 40,000 m^2 on ground, tracking monitor during whole lifting of roof and deflection measure after connection and unloading. Engineering objectives have been reached and acceptance of structural Great Wall Cup has been passed.
分 类 号:TU758[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117