检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周瑶[1]
出 处:《建筑电气》2008年第10期18-19,共2页Building Electricity
摘 要:分析了一路主供,一路备用,单母线分段的10kV变配电站,在主供电源与备用电源短路电流相差比较大时,备用电源投入后,出线断路器出口发生短路事故时,容易发生越级跳闸造成全站停电。提出:根据主供与备用电源运行方式,分别设置各自不同的速断保护整定值,采用微机保护,自动选择需要投入的保护整定值,以防止发生越级跳闸。A 10kV substation with one loop as the main power supply, one loop as the standby power supply and with single bus in section is studied. When the difference of short-circuit current between the main power supply and the standby power supply is large , the standby power supply is switched on and short-circuit accidents are occurred at the exit of the outlet circuit breakers, override trip is easy to happen and it causes the power failure of the whole station. It is suggested that setting values of instantaneous trip protection are set based on the operation mode of main power supply and standby power supply. In order to prevent override trip from happening, microcomputer protection is be adopted to automatically select setting values.
分 类 号:TM561[电气工程—电器] U226.7[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229