煤矿电网电压互感器故障的PSCAD仿真研究  被引量:2

PSCAD Simulation Research of Fault of Voltage Transformer of Coal Mine Power Network

在线阅读下载全文

作  者:袁威 董新伟[2] 徐敏[2] 

机构地区:[1]开滦集团蔚州矿业公司崔家寨煤矿,河北蔚县075077 [2]中国矿业大学信电学院,江苏徐州221008

出  处:《工矿自动化》2008年第5期26-29,共4页Journal Of Mine Automation

摘  要:在煤矿电网中,由于单相接地故障而引起的母线电压互感器(PT)烧毁的现象时有发生。文章依据电网单相接地故障时的等效模型仿真了PT一次侧电流的暂态特性,认为引发PT故障的主要原因为煤矿电网单相接地时电容电流值较大。利用电力系统仿真软件PSCAD/EMTDC对一组6 kV PT进行仿真,并比较了PT一次侧经非线性电阻(消谐器)接地、PT开口三角处并电阻和系统中性点经消弧线圈接地的3种解决措施。文章最后指出中性点经消弧线圈接地是解决煤矿电网中单相接地故障的最合适方法。The burning out of voltage transformer happens occasionally in coal mine power network because of single-phase grounded fault. According to equivalent model of single-phase grounded fault of power network, simulation analysis was presented on the transient characteristics of the primary side current of PT in the paper. It was considered that the causation of fault of PT is large single phase-to- ground capacitive current in coal mine power network. And a group of voltage transformer in 6 kV distribution system was simulated based on PSCAD/EMTDC. Three kinds of eliminating resonance method in different condition were compared including connecting a nonlinear resistance to neutral point of high voltage side of three-phase PT, connecting a damping resistance to the secondary assistant windings of three-phase PT, grouding neutral point through arc suppression coil. At last the paper indicated that neutral grounde power network.

关 键 词:煤矿电网 电压互感器 故障 中性点接地系统 消弧线圈 PSCAD 

分 类 号:TD611[矿业工程—矿山机电]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象