检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西南交通大学土木工程学院,四川成都610031
出 处:《测绘工程》2008年第5期16-18,共3页Engineering of Surveying and Mapping
基 金:广东省科技项目(200514)
摘 要:在隧道施工过程中,根据现场围岩变形的监测结果,可以及时分析与预测围岩稳定性。结合小金口连拱隧道监测数据,利用数值分析方法对Ⅲ类围岩拱顶沉降位移监测数据进行处理与分析,计算得出:采用Boltzman函数拟合分析方法,能够较好地反映连拱隧道施工过程中拱顶的沉降变化情况,并得到连拱隧道拱顶沉降的控制标准。According to result of monitored and measured surrounding rock deformation, stability of surrounding rock is analyzed and predicted in the construction of the tunnel. Arch-top subsidence is calculated and analyzed in surrounding rock types Ⅲ by monitored and measured data of XIAOJINKOU double-arch tunnel in the paper. Regression analysis by Boltzman function can reflect the change of arch-top subsidence in double-arch tunnel construction. So arch-top subsidence control base of double-arch tunnel has been suggested.
分 类 号:U459.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15