汶川地震灾后公路恢复重建规划的工程技术对策  被引量:1

Engineer technology of highway rebuilt plan after the Wenchuan earthquake

在线阅读下载全文

作  者:杜江涛[1] 关昌余[1] 汪亚干[1] 肖春阳[1] 丽萌[1] 杨爱国[1] 

机构地区:[1]交通部规划研究院

出  处:《交通世界》2008年第20期82-84,共3页Transpoworld

摘  要:5.12汶川地震灾害造成灾区内大量公路交通设施损毁、多条公路一度断通.公路基础设施产生了灾难性破坏。交通运输部按照国务院总体部署.在行业内迅速开展其他灾后应急救援和恢复重建工作的同时.与四川、甘肃、陕西3省共同抓紧编制完成了《汶川地震灾后公路恢复重建规划》。本文结合规划,从规划区内公路灾损基本情况、制定公路恢复重建工程方案把握的主要原则、采取的主要技术对策等方面进行阐述.供探讨。The Wenchuan Earthquake on May 12 brought huge damages on highway facilities and infrastructures. According to the overall arrangement of the State Council, the Ministry of Transport has been making much effort in the emergency response and rebuilding projects, and at the meantime, it worked with Sichuan, Gansu and Shanxi provinces to compile the Highway Rebuilding Plan after the Wenchuan Earthquake. The article, based on the Planning, talks about the highway damages, the major principles and technical measures of the Plan.

关 键 词:公路基础设施 重建规划 地震灾害 工程技术 灾后 汶川 交通设施 重建工作 

分 类 号:U491[交通运输工程—交通运输规划与管理] TU984.114[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象