检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州交通大学,甘肃兰州730070
出 处:《水利与建筑工程学报》2008年第4期40-42,共3页Journal of Water Resources and Architectural Engineering
基 金:铁道部"青蓝工程"基金项目(2005G032)
摘 要:针对青藏高原环境、气候特点及压浆材料本身的特点,通过试验采用体积排水法测试水泥浆体预养前后、冻结前后体积变化率及水泥浆体冻胀后、预养前的体积变化率,分析研究在同一外加剂和同一水灰比的情况下水泥浆体体积变化率与预养时间以及温度变化的关系,研究得出,水泥浆体体积变化率与预养时间成对数函数关系,与温度变化的关系可用多项式来体现。Aimed at the environmental quality in the region of Qinghai - Tibet Plateau and the features of nudjacking material, the volume change rates of the cement paste before and after the precured time and freezing are measured as well as after freezing and before precuring through a volume draining method, and the relationship between the volume change rate and the precured time and temperature of the cement paste under the condition of same admixture and water cement ratio is analyzed. The research results show that the volume change rate of the cement paste has a logarithmic function relationship to the precured time, and a multinomial relationship to the temperature.
分 类 号:U448.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15