检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉理工大学理学院,湖北武汉430070 [2]贵州省交通科学研究院,贵州贵阳550014
出 处:《华中科技大学学报(城市科学版)》2008年第3期214-217,共4页Journal of Huazhong University of Science and Technology
摘 要:采用单元死活技术,以贵州省境内的清水大桥为工程背景,对预应力桁式组合拱桥的施工过程进行了数值模拟,以了解成桥过程中的应力、位移变化情况。计算结果显示,该桥体系转换之前力学性能良好,竖向位移较小;体系转换之后局部区域拉应力高于C50混凝土的抗拉极限强度,此为造成该区域产生裂缝的主要原因。Based on the Qingshui Bridge in Guizhou Province, the method of element's birth and death has been adopted for carrying numerical simulation of the construction process of the trussed combination arch bridge. And then, the stress and displacement in the corresponding construction process can be obtained. The results showed that the mechanics performance of the bridge was in good condition and the displacement on vertical direction was small before the structural system was transformed, but the stress in some regions of the bridge was above the tensile strength of the concrete C50 after the structural system was transformed, which may be a key factor on crack occurrence in these regions.
分 类 号:U448.22[建筑科学—桥梁与隧道工程] TU311.41[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222