检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华中科技大学土木工程与力学学院,华中科技大学控制结构湖北省重点实验室,武汉430074
出 处:《振动与冲击》2008年第10期61-64,80,共5页Journal of Vibration and Shock
基 金:国家电网公司科技项目([2007]413)
摘 要:输电线路的覆冰及其引起的各类冰害事故严重危害了我国电力系统的安全运行。以晋东南-南阳-荆门1000kV大跨越输电线路为工程背景,采用非线性时程分析法,计算分析了四种工况下的输电线路的脱冰跳跃问题,并采用六种双层粘弹铅芯阻尼器布置方案对其进行了控制研究。分析结果表明,输电线路的脱冰跳跃问题不容忽视,粘弹铅芯阻尼器对其具有较好的减震效果。That ice deposits on transmission lines is of great danger to the security of service of an electrical power system.Based on the example of Jindongnan-Nanyang-Jingmen 1000kV transmission lines system,jumping responses induced by ice-shedding in four cases are investigated,and the vibration controls in six installing cases of lead viscoelastic dampers using the nonlinear time history analysis method are studied.The results indicate that taking jumping of transmission lines induced by ice-shedding into account is very important and lead viscoelastic dampers possess better ability to suppress vibration.
分 类 号:TU311.3[建筑科学—结构工程] TM753[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117