吉林台一级电站水库初次蓄水期渗流观测及分析  被引量:1

Observation and analysis on seepage in initial impoundment period of Jilintan I hydropower station

在线阅读下载全文

作  者:郝佳圣[1] 梁园园[2] 马宇燕[1] 李小虎[1] 贡保臣 

机构地区:[1]北京华可实工程技术有限公司,北京100025 [2]北京木联能工程科技有限公司,北京100011

出  处:《大坝与安全》2008年第4期34-37,41,共5页Dam & Safety

摘  要:渗流及渗流量分析是初次蓄水的重要分析内容之一。本文通过对坝基、坝肩地下水位观测资料的分析,评价渗流稳定和总结渗流规律,运用渗流渗透压力和库水位相关关系、位势分析等手段证明了吉林台一级电站尽管观测渗流量较大但不存在影响稳定问题的结论。电站是安全的,为堆石坝的渗流稳定分析提供参考。Seepage analysis is an important part in initial impoundment analysis. By analysis on underground water level at dam foundation and abutment, seepage stability can be evaluated and seepage rules can be summarized. Through relation between seepage pressure and reservoir water level, as well as potential analysis, even though seepage amount was large, the conclusion that Jilintan I hydropower station was stable and safe was proved.

关 键 词:堆石坝 渗流 观测 分析 吉林台一级水电站 

分 类 号:TV698.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象