摘 要:1000kV特高压输电线路铁塔结构尺寸大、横担长、部件大,使得特高压线路组塔施工难度加大。文章在借鉴我国500kV和750kV架空输电线路组塔施工技术和经验的基础上,提出了内悬浮外拉线抱杆组塔、落地摇臂抱杆组塔、塔式起重机组塔等适合于特高压线路铁塔组立的方法。该方法已在特高压交流试验示范工程中得到应用,为后续工程建设提供了技术储备。Due to its large structural size,long crossarm and heavy weight of components, the construction of tower assembling and erection for 1000kV AC power transmission becomes more difficult. On the basis of drawing on the technology and experiences of tower assembling and erection for 500kV and 750kV transmission lines in China, such methods suitable to the tower assembling for UHV transmission line as inside suspension pole with outside pulling wires, ground rocker pole and tower crane are adopted and applied in UHVAC test and pilot project, pursuantly the task of tower assembling and erection in this project is completed, from this a lot of practical experiences are achieved and can be available for reference to subsequent engineering and construction..
关 键 词:特高压(UHV) 铁塔组立 内悬浮外拉线抱杆 落地摇臂抱杆 塔式起重机
分 类 号:TM754[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28