隧限-2隧道通行双层集装箱列车的可行性分析  被引量:1

Feasibility Study for Two-storey Container Trains Passing through Tunnels with Tunnel Clearance-2

在线阅读下载全文

作  者:吴治家[1] 徐鸿燕[1] 范永光[1] 

机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063

出  处:《现代隧道技术》2008年第5期12-17,共6页Modern Tunnelling Technology

摘  要:随着集装箱物流的发展,部分既有铁路要改造为双层集装箱运输通道,然而既有铁路的隧道限界大多为隧限-2,不能满足双层集装箱运输隧道建筑限界。文章通过对限界、接触网悬挂方式及隧道处理措施等方面的研究,提出了隧限-2B隧道通行双层集装箱列车是可行的结论。With the development of container transport, part of current railways should be reconstructed to be the passage for two-storey containers. However, most of the current railway tunnels are constructed with Tunnel Clearance-2, which can not satisfy the requirements of the tunnel construction clearance for passing through two-storey containers. This article studied the clearance, suspension mode of contact net and treatment of tunnel structure etc., put forward a Tunnel Clearance-2B for passing through two-storey container trains.

关 键 词:隧限-2隧道 双层集装箱运输 可行性分析 

分 类 号:U456[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象