检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:敖凌云[1] 朱祥平[1] 王玉虎[1] 刘宏民[1] 胡宇[1]
出 处:《电力勘测设计》2008年第5期46-49,共4页Electric Power Survey & Design
摘 要:火力发电厂主厂房建筑三维设计内容繁多、过程较复杂,为了保证主厂房内各专业协同设计、有关数据的统一性和唯一性,应使主厂房建筑三维模型建模程序标准化、规范化,明确建模内容和有关分类,解决好数据传递的接口和方式。本文为解决上述问题,进行了较详细的分析和研究,并提出了具体方法和措施,在满足主厂房协同工作的同时,也为后续工作提供必要的数据和背景资料,保证建筑设计文件与主厂房三维模型同步更新,进一步提高建筑设计效率和质量。这将在实际工程中产生明显的设计效率和经济效益。Because contents of architectural 3D design is very more and its course is quite complicated to main block in power plant, for ensuring the togetherness and uniqueness to work in coordination with related to specialized profession and data, the program of setting u Parchitectural 3 D models of main block must be standardization and orderliness, contents and classifications of setting u P3D model must be definite, and the interface and way of passing on data must be designed well. For solving the above mentioned questions, this article carefully proceeds with the analysis and research, and bring u Pconerete methods and measures. It will meet the need of work in coordination with design of main block, will provide necessary data and background materials for next work, and will ensure synchronic update to building design files and 3D models of main block. It will improve efficiency and quality of architectural design further, will produce good results of design efficiency and economic benefit in practice project.
分 类 号:TU271[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229