锦屏二级水电站地下厂房岩锚梁施工  被引量:4

Construction of rock anchored beam of underground powerhouse for Jinping-II Hydropower Station

在线阅读下载全文

作  者:张建均 

机构地区:[1]葛洲坝集团第二工程有限公司,四川成都610091

出  处:《水利水电技术》2008年第11期49-51,共3页Water Resources and Hydropower Engineering

摘  要:锦屏二级水电站地下厂房岩锚梁地质条件较差,岩锚梁开挖过程中采取了沿保护层深孔预裂、分区开挖,在斜台下部增加锁口锚杆、用高强树脂锚杆超前支护、超前灌浆等多项有效技术措施,岩壁梁施工取得了良好的效果。As the geological condition for the rock anchored beam of the underground powerhouse of Jinping-Ⅱ Hydropower Station is poor, the effective construction measures such as deep hole pre-splitting and zoning excavation along the protected layer, adding locked anchor-bars at the lower part of the declined table, advanced supporting with high-strength resin anchor-bars, advanced grouting etc. are adopted therein, and then better construction effect is obtained as well.

关 键 词:锦屏二级水电站 地下厂房 岩锚梁 施工 

分 类 号:TV74[水利工程—水利水电工程] TV731.6

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象