检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水力发电》2008年第10期67-68,共2页Water Power
摘 要:宝泉抽水蓄能电站技施设计阶段水机专业采用了三维设计,三维设计具有期短、修改工作量小、设计变更快捷、减少设备布置之间的碰撞和干扰等优点。宝泉工程水利专业直接利用三维设计出图2套,间接出图6套,为三维设计的推广积累了经验。3D design was used in the hydraulic machinery design of the Baoquan pumped storage power station during the period of technical and construction design. The 3D design has the advantages of short drawing period, small modification working quantity, fast design alteration, the reduction of collision and interference between equipment arrangements. 2 sets of drawings for the Baoquan Project were designed by 3D design directly and 6 sets of drawings indirectly, which accumulates the experience for the popularization of 3D design.
分 类 号:TV743[水利工程—水利水电工程] TH122[机械工程—机械设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15