检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:薛云飞[1]
机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《东北水利水电》2008年第11期1-2,共2页Water Resources & Hydropower of Northeast China
摘 要:卜寺沟水电站预可阶段正常蓄水位是考虑规划成果、地形、地质条件、梯级衔接、水库淹没、筑坝技术、水能资源利用等因素综合初选的。从理论角度分析,水库淹没对水库内寺庙的影响,按全部淹没进行经济补偿处理代价较小;其社会环境敏感因素对正常蓄水位的选择不应起决定性作用。但是,考虑到少数民族群众、僧侣和地方政府的要求,适当降低正常蓄水位,以减少对扎西日岗寺庙的影响,将带来较积极的社会影响。The normal water level of BuSiGou hydropower station in the phase of pre-feasibility study was chosen when considering factors such as planning result,topography,geological conditions,cascade reservoirs cohesion,reservoir inundation,dam construction technique and water power utilization. Based on theoretical analysis,if these temples in the reservoir area were almost submerged,then the economic compensation cost of the reservoir inundation is less. Social environment sensitive factors don’t play a decisive role in the selection of normal water level. However,considering the requirements of minority,monks and local government,the normal water level should be properly decreased to reduce the influence on the Zhaxirigang temple,which would bring the positive social influence.
分 类 号:TV742[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.173