检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈列[1,2]
机构地区:[1]湖北工业大学,湖北武汉430068 [2]茂名职业技术学院,广东茂名525011
出 处:《安徽建筑》2008年第6期171-173,共3页Anhui Architecture
摘 要:由于人工挖孔灌注桩在施工的过程中会出现各种各样意外的情况,如果不及时处理或处理不当,就会出现桩的质量事故。对于桩质量事故的处理有很多种方法,本例由于已完成第三层楼面的施工的特殊性,采用独立基础上加框架结构支承外围加大柱的方法,经过验算和专家审核切实可行。There are various expected factors in the construction of under-reamed bored pile that will incur engineering qualitative accident if the pile is not treated timely or properly. There are many ways of accident pile treatment and in this case as the third floor above is under construction, the method of adding columns around the original column supported by the frame structure set on an isolated footing is used. And this method has been proved feasible after check analysis and professional verification.
分 类 号:TU712.4[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145