检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李长喜[1] 唐良民 周灿灿[1] 王昌学[1] 张树东[3] 杨仁林[3]
机构地区:[1]中国石油勘探开发研究院,100083 [2]中油测井技术服务有限责任公司 [3]四川石油管理局测井公司
出 处:《石油勘探与开发》2008年第6期736-741,共6页Petroleum Exploration and Development
基 金:中国石油天然气股份有限公司攻关项目(Ktqq-2005-036)
摘 要:欠平衡钻井和欠平衡测井技术对于直接发现和保护油气层、提高单井产能和勘探开发成功率具有非常重要的意义。欠平衡测井时的井口装置与常规测井有很大的差别,需要对双侧向测井仪器的加长电极进行改造,使其长度缩短,以适应井口装置的长度,这一改造使得深侧向测井值明显降低,不能真实反映储集层电性。应用有限元素法计算了欠平衡条件下深侧向电极系系数随加长电极长度的变化规律,即加长电极越长,深侧向电极系系数越小。建立了欠平衡条件下深侧向测井响应的校正方法,并应用实际测井资料验证了校正结果的可靠性。该方法适用于任意长度的加长电极,可直接用于现场测井资料的预处理,校正后的深侧向测井电阻率可用于测井解释建模和油气定量评价。Unde-balanced drilling and under-balanced logging are very important techniques for directly identifying and protecting hydrocarbon reservoirs and enhancing productivity. The wellhead assembly under under-balanced logging is greatly different from that under conventional logging. Therefore, the length of cable electrode for dual laterolog should be reduced to adapt to the wellhead assembly, which causes the deep laterolog responses to drop, and can not truly reflect the reservoir property. The rule of electrode coefficient varying with the cable electrode length under under-balanced condition has been computed using finite element method, that is, the longer the cable electrode, the smaller the electrode coefficient. The deep laterolog resistivity correction method under under-balanced condition is introduced. Field data examples are used to test the new method, and shows that this method is reliable. This method can be used to any length of cable electrode and can be applied to field pretreatment directly. The corrected deep latcrolog resistivity can be used in logging interpretation and quantitative hydrocarbon evaluation.
关 键 词:欠平衡测井 油气层保护 双侧向测井 电极系系数 视电阻率校正 有限元素法
分 类 号:TE613.84[石油与天然气工程—油气加工工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28