机构地区:[1]内蒙古科技大学能源与环境学院,内蒙古包头014010 [2]内蒙古科技大学经济与管理学院,内蒙古包头014010
出 处:《内蒙古科技大学学报》2008年第2期132-136,共5页Journal of Inner Mongolia University of Science and Technology
基 金:国家自然科学基金资助项目(70662002)
摘 要:B厂在CSP生产线的基础上新建了中厚板生产线.两条生产线的钢种不同,拉坯速度也不同,因而共享2座转炉钢水的调度十分复杂.建立了基于浇次计划的炉次计划模型,经过变换,将混合整数规划问题转化为线性规划迭代求解问题.用Matlab编写程序进行求解,并给出了一个计算实例.A slab production line of steelmaking-eontinuous casting was built on the basis of the original CSP production line in the factory B. The casting speeds of the two lines were different, in which the steel groups to be east were different, too. So it was very complex to schedule the molten steel for the two lines sharing the two converters's molten steel at the same time .A model of furnace plan based on casting plan was established, which was converted from mixed integral program problem to linear program problem and solved iteratively with MATLAB procedures. An example was calculated by using this model.
分 类 号:TB114.1[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.85