检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]温州大学建筑与土木工程学院,浙江温州325005 [2]东南大学岩土工程研究所,南京210096
出 处:《工程勘察》2008年第12期1-4,共4页Geotechnical Investigation & Surveying
基 金:住房和城乡建设部科技计划项目(2008-K2-11)
摘 要:带桩帽的预应力薄壁管桩结合土工格栅加筋垫层的刚性桩复合地基处理高速公路深厚软土地基,具有施工质量易控制、施工速度快、工后沉降及不均匀沉降小、地基处理深度大、复合地基承载力大、造价比较适中等突出优点。本文结合连盐高速公路试验段施工期间和路堤填筑期间的实测资料,通过对填筑期间土压力、沉降、侧向变形的分析,突出体现了预应力管桩在加固深厚软土地基中的实用性和优越性。The Prestressed Tubular Concrete Pile (PTC pile) with individual cap combined geosynthetic- reinforcement has demonstrated excellent performance characteristics in soft ground treatment for highway engineering. This system owns technical and economical advantages over other methods, for example, convenient alternating construction, little post-construction and differential settlements, deep depth of ground improvement, high load capacity and savings of construction time and costs. In this paper, one case on Lian-yan expressway is presented to investigate the performance of soft ground improvement. The observed data on soil pressure, settlement and later deformation during filling show the advantage of the application of PTC pile in deep soft ground improvement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222