检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]清华大学水沙科学与水利水电工程国家重点实验室,北京100084
出 处:《水力发电》2008年第11期48-51,共4页Water Power
基 金:国家自然科学基金项目(50539070);973计划项目(2006b403304)
摘 要:对水布垭水利枢纽泄洪消能布置进行了整体水工模型试验,研究分析溢洪道入口、消能区及坝址下游水流特性,观测了窄缝挑坎挑流特性、消能区的冲淤情况和防淘墙的脉动压力和频率,从而解决了水布垭工程泄洪消能问题。A model experiment was carried out on the hydraulic structure layout of flood discharge and energy dissipation for the Shuibuya hydropower project. The characteristics of flow in the entrance of spillways, energy dissipation zone and downstream the dam toe were studied. Jet flow, scour and deposition in the energy dissipation zone as well as pulsation pressure and frequency against the anti-scour walls were measured and analyzed in order to solve the problems of flood discharge and energy dissipation for the Shuibuya Hydropower project.
分 类 号:TV131.65[水利工程—水力学及河流动力学] TV263
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.146