检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水力发电》2008年第11期98-102,共5页Water Power
摘 要:新近建成的一批坝高大于150m的面板坝的面板都发生了沿垂直缝的挤压破坏问题,因此,避免面板发生挤压破坏成为超高面板坝设计中有待解决的重大设计课题。通过分析面板发生挤压破坏的工程实例,提出了面板挤压破坏的临界挠度,通过控制挠度来控制面板压应变,避免面板发生挤压破坏;还提出了超高面板坝防止面板挤压破坏的具体设计改进方法。The crushing rupture of face slab along vertical joint occurred in some newly completed concrete face rockfill dams with the height of more than 150m. Therefore, how to modify the design principles against the accident becomes most challengeable task to the designers. Based on the analysis of actual project examples with crushing collapse, this paper presents the critical deflection of crushing rupture of face slab and the prevention of face slab from crushing rupture by controlling the strains of face slab. In addition, it also puts forward some design improvements for avoiding the crushing rupture of face slab of super-high CFRD.
关 键 词:面板 临界挠度 设计改进 挤压破坏 垂直缝 超高面板堆石坝
分 类 号:TV641.43[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222