检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江工程监理咨询有限公司(湖北),武汉430010 [2]长江科学院信息中心,武汉430010 [3]长江水利委员会国际合作与科技局,武汉430010
出 处:《长江科学院院报》2008年第6期52-57,共6页Journal of Changjiang River Scientific Research Institute
摘 要:地震堰塞湖/坝是4类堰塞湖/坝中破坏性最为严重的一种。2008年5月12日汶川8级强震造成具有一定规模的堰塞湖/坝共35座,其中极高危级的唐家山堰塞湖/坝成为当下世界关注的"悬湖"。简要介绍了唐家山堰塞湖的除险过程,并通过对我国1949年以来的地震情况及5.12汶川地震堰塞湖形成情况的分析,概述了对地震堰塞湖/坝先应急除险、后加固处理等综合技术。Earthquake-induced dammed lake/barrier bar which is formed by mountain-slope gliding in earthquake is the most destructive among the four sorts of barrier lakes/dams. Thirty-five barrier lakes/dams possessing a certain scale were caused and formed by the Wenchuan Earthquake of magnitude eight on May 12, 2008. A- mong these, the extremely dangerous Tangjiashan Quake Lake had become a hanging lake arising from the worlds attention. However, the risk was eliminated on June 11. This paper also makes a general introduction on the normal technology dealing with barrier lake/dam, which is to response the emergency event and remove the dangerous status before strengthening the barrier lake/dam.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28