机构地区:[1]中国石油天然气勘探开发公司生产作业部,北京100034 [2]中国石油海外研究中心,北京100083
出 处:《石油钻探技术》2008年第6期59-62,共4页Petroleum Drilling Techniques
摘 要:缅甸PSC-2井地层压力当量密度"窗口"很窄,地层对钻井液密度和排量非常敏感,给固井施工带来很大的困难。该井在下完套管后,发生了钻井液漏失,一级固井封隔器失效后油气上窜,使固井工作无法按正常设计程序施工。随后采取了一系列技术措施,如借助地层能量,利用"U"形管原理重新建立循环;控制回压,保持进、出口流量一致,实现"平衡法"固井等,完成了该井的二级固井以及对一级固井的补救施工,初步形成了又涌又漏条件下高压气井的固井施工方案。重点介绍了PSC-2井244.5 mm技术套管在复杂井眼条件下的固井施工情况。The formation pressure window of Well PSC 2 is very narrow, and the formation is sensitive to density and drilling fluid velocity, which brings a challenge to well cementing operation. Drilling fluid leaked to formation after running casing; oil/gas goes up after first cementing packer failure, which prevented irnplementation of the designed operation. A series of measures were used in following operations, including reestablishing drilling cycle with U-tube principle supported by formation energy, implementing "balance method" cementing to maintain inflow and outflow volume by adjusting back pressure. The second-stage cementing was completed and first-stage cementing was remedied with these measures. The preliminary procedure for cementing high pressure gas well with leaking and kicking was developed. This paper introduced the cementing technology of φ244.5 mm intermediate casing in high pressure gas well.
关 键 词:高压气井 双级固井 水泥浆 固井质量 PSC-2井
分 类 号:TE256[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222