检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《空间控制技术与应用》2008年第6期3-7,共5页Aerospace Control and Application
摘 要:中国第一颗月球探测卫星"嫦娥一号"于2007年10月24日成功发射并于11月7日顺利进入了距月面200km的科学探测的使命轨道,原计划在整个飞行过程中比较关键的轨道段是地月转移轨道段。要进行2至3次中途轨道修正,而实际的飞行结果只在第41小时作了一次很小的修正,所用的速度增量是4.8m/s。基于有关的实测数据对此进行详细的分析,以期获得一些规律性的认识。CE-1, the Chinese first lunar exploration satellite, was successfully launched on 24 Oct. 2007 and captured into a mission orbit of 200 km from lunar surface on 7 Nov. 2007. The translunar trajectory is the key section within the whole flight process. According to the original design 2 or 3 times of midcourse corrections would be performed during this orbital segment. However, only one correction maneuver has been carried out at the 41st hour after the translunar trajectory insertion and the velocity increment needed was only 4.8m/s. Some detailed analysis based on the real tracking data and the orbit determination results is presented here in this paper.
关 键 词:月球探测 月球卫星 调相轨道 地月转移轨道 中途修正机动
分 类 号:V448.2[航空宇航科学与技术—飞行器设计]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222