检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李树宽[1]
出 处:《北方交通》2008年第11期85-87,共3页Northern Communications
摘 要:根据工程量清单计价模式的特点,建设单位应从三个阶段采取相应措施加强工程造价的控制:在招标投标阶段,编制完善的招标文件和准确的工程量清单,评审投标报价的合理性,进而确定合同价的计价方式;在工程施工实施阶段,严格合同管理和工程变更签证管理;在工程竣工结算阶段,严格按合同和签证审核竣工结算,从而强化对工程造价的控制。In accordance with features of mode of quotation for bill of engineering quantities, the building unite should take appropriate measures to strengthen control of engineering cost from 3 stages - at stage of tender and bid, to draw up the perfect tender file and exact bill for engineering quantities, to assess and examine the rationality of bid quotation and to determine the charging way of contract;at stage of engineering construction and implementation, to manage strictly the contract and the visa of engineering change; at stage of final estimate after completion of engineering, strictly to examine and verify the final estimate according to contract and visa and to strengthen the control of engineering cost.
分 类 号:U411[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117