检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐亚君[1] 杨伟[1] 宫蕾[1] 谢邦互[1] 杨鸣波[1]
机构地区:[1]四川大学高分子材料科学与工程学院,高分子材料工程国家重点实验室,四川成都610065
出 处:《塑料工业》2008年第12期32-34,37,共4页China Plastics Industry
基 金:国家自然科学基金(20734005;10590351)资助
摘 要:研究了注射成型的工艺参数对共聚聚丙烯成型收缩的影响及其脱模后24h和48h时收缩率的变化。结果表明,注射温度提高,材料的成型收缩率减小到一定程度后基本不变;提高注射压力、延长保压时间及冷却时间,成型收缩率呈下降趋势;模具温度升高,成型收缩率先基本不变后有所增大;注射速度的提高使PP成型收缩率逐渐增大。脱模后24h内,共聚PP通常完成了大部分后收缩。The effects of processing parameters in injection molding on the mold shrinkage of co-polypropylene and the change of shrinkage within 24 h and 48 h after demolding were studied. The results indicated the mold shrinkage of the PP decreased to a certain extent, and then kept constant with the rise of injection temperature ; with the increases of injection pressure, dwell time and cooling time, the mold shrinkage of the material declined; with the elevation of mould temperature, the mold shrinkage of the polypropylene primarily unchanged, and then increased; the increase of injection velocity made the mold shrinkage higher and higher. Most of the post shrinkage of the co-polypropylene was completed within 24 h after demolding.
分 类 号:TQ325.14[化学工程—合成树脂塑料工业]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.87