检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部水文局,北京100053
出 处:《水文》2008年第6期53-55,共3页Journal of China Hydrology
摘 要:根据有关规范、规定和标准,对核电厂址地区可能最大降水(PMP)计算进行了比较系统的介绍,对核电厂址地区可能最大降水(PMP)计算的几个关键技术作了较为详细的分析论述。作者认为:必须根据翔实的时段暴雨量资料,应用多种途径的计算方法,经过合理性分析论证,可能最大降水(PMP)计算成果才能为核电厂址防洪、厂区和厂区外围排水系统及核电厂构筑物屋面排水设计提供可靠参数和计算依据。This paper systematically introduced calculation of probable maximum precipitation (PMP) for the site area of nuclear power plant based on the concerned criterions, regulations and standards, and analyzed the key technical problems in calculation of the probable maximum precipitation (PMP) in detail. It was considered that the rational analysis and demonstration must be made by using several calculation methods according to full and accurate data of duration storm rainfall to provide credible parameters and calculation base for flood control of nuclear power site location, drainage system design of the plant district and area around, and drainage design of the roof of nuclear power plant structures.
关 键 词:核电厂 可能最大降水(PMP) 时段暴雨量资料
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229