检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:侯学勇[1] 鞠平[1] 邱巍[1] 赵晋泉[1] 罗建裕[2] 朱寰[2]
机构地区:[1]河海大学电气工程学院,江苏南京210098 [2]江苏省电力公司,江苏南京210024
出 处:《中国电力》2008年第12期10-13,共4页Electric Power
摘 要:低频减载作为电力系统的第三道防线,是一种有效防止系统频率崩溃的手段。结合江苏电网的实际情况,研究电力系统低频减载的优化配置。采用多机模型的时域动态仿真方法,用故障仿真法确定适合低频减载分析的系统模型和参数,通过选择江苏电网的一个典型分区作为研究对象,提出轮级协调动作配合后加速动作来优化调整现有低频减载的方案,以获得更高的安全性和经济性。Under-frequency load shedding, as a measure of the third defensive line of power systems, is one of the effective methods to mitigate the frequency collapses. This paper carried out a research on the optimal setting of under-frequency load shedding in Jiangsu power grid. It takes a measure with multi-machine model by time-domain dynamic simulation method. First, the system model and its parameters were confimled by fault simulation method. Second, the control strategy coordinated with the after acceleration was proposed to adjust the existing under-frequency load shedding scheme by taking a sub-area as a representative in Jiangsu power grid. The simulated result shows that the method is effective and economical.
分 类 号:TM714[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249