检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华东电力设计院,上海200063 [2]上海市电力公司,上海200122 [3]浙江大学岩土工程研究所,浙江杭州310007
出 处:《华东电力》2008年第11期66-69,共4页East China Electric Power
摘 要:指出超大超深基坑工程是危险性高、影响因素众多的复杂系统工程,此类基坑工程的围护结构设计计算分析相关经验较少,围护设计存在很多问题。以上海世博地下变电站工程为例,阐述了该超大超深基坑工程的特点,通过国内某典型软土地基中超大超深基坑围护的实例设计分析,探讨了计算方法的选取,并对相关影响因素进行了分析。With high risks and various influencing factors, the ultra-large and ultra-deep foundation pit project can be considered as a complicated systematical project, and there is little design and calculative analysis experience of its retaining structure. Taking the underground Shibo Substation as the example, the features of the ultra-large and ultra- deep foundation pit project are analyzed. Through design analysis of one typical ultra-large and ultra-deep foundation pit in soft soil, the selection of calculation methods is discussed, and the influencing factors are analyzed.
分 类 号:TM63[电气工程—电力系统及自动化] TU271.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117