依托特高压提高湖北电网消纳西南水电能力的探讨  被引量:3

Discussing the Way to Accept Hydroelectric Power from the Southwest of China to Hubei Province

在线阅读下载全文

作  者:奚江惠[1] 胡济洲[2] 

机构地区:[1]华中电力调度通信中心,湖北武汉430077 [2]湖北省电力公司发展策划部,湖北武汉430077

出  处:《华中电力》2008年第6期14-17,共4页Central China Electric Power

摘  要:我国西南地区是水电富矿地区。在分析湖北省一次能源状况和中长期用电趋势的基础上,围绕我国西南水电送出规划,对湖北电网消纳西南水电的必要性和可行性进行了分析,提出依托特高压工程提高湖北电网消纳西南水电的方案建议。The Southwest of China is famous for resourceful waterpower. The paper analyses the energy sources in Hubei Province and electric power supply in Hubei by 2030. Based on the projects of transferring the hydroelectric power from the Southwest of China, the paper discusses the necessity and feasibility for Hubei to accept hydroelectric power largely from the Southwest of China. Then the paper gives a project for Hubei Province to enhance the ability to accept the hydroelectric power largely from the Southwest.

关 键 词:西南水电 特高压 电网规划 

分 类 号:TM715[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象