广州珠江黄埔大桥悬索桥北锚碇基坑开挖及内衬施工技术  被引量:4

Construction Techniques for Excavation and Lining of North Anchorage Foundation Pit of Suspension Bridge of Huangpu Bridge over Zhujiang River in Guangzhou

在线阅读下载全文

作  者:田欣[1] 姚志安 方鏸[3] 

机构地区:[1]中交第二公路工程局有限公司,陕西西安710065 [2]广州珠江黄埔大桥建设有限公司,广东广州510735 [3]中铁大桥局集团桥科院有限公司,湖北武汉430034

出  处:《桥梁建设》2008年第6期49-52,共4页Bridge Construction

摘  要:广州珠江黄埔大桥悬索桥北锚碇位于珠江大壕沙岛上,地下水位受潮汐影响严重,深基坑开挖风险较高,主要介绍该悬索桥北锚碇基坑开挖及内衬施工技术。The north anchorage of the suspension bridge of Huangpu Bridge over Zhujiang River in Guangzhou is located at the Big Haosha Island in the Zhujiang River, where the underground water level is severely influenced by the tide and the excavation of the deep foundation pit for the anchorage is fairly risky. In this paper, the construction techniques for the excavation and lining of the foundation pit are mainly presented.

关 键 词:悬索桥 锚碇 基坑开挖 内衬 施工方法 

分 类 号:U445.55[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象