缓粘结预应力技术在大跨度混凝土井字梁中的应用  被引量:6

APPLICATION OF RETARD-BONDED PRESTRESSED TECHNIQUE IN CONCRETE GRID-BEAM STRUCTURE

在线阅读下载全文

作  者:尚仁杰[1] 吴转琴[1] 喻远鹏 岳彦博 宫锡胜[3] 

机构地区:[1]中国京冶工程技术有限公司,北京100088 [2]中旭建筑设计有限责任公司,北京100044 [3]中冶集团建筑研究总院,北京100088

出  处:《工业建筑》2008年第11期36-39,共4页Industrial Construction

基  金:财政部资助项目

摘  要:介绍了缓粘结预应力技术在承德市城市展览馆32.4m×33.2m跨周边不规则井字梁中的应用,介绍了井字梁预应力筋的设计计算方法,根据平衡荷载大小计算了预应力次弯矩和预应力反拱,计算了考虑次弯矩后缓粘结预应力混凝土梁的名义拉应力、极限承载力,为缓粘结预应力混凝土梁、特别是大跨度井字梁的设计计算提供参考。The application of retard-bonded prestressed technique is introduced in the design of concrete grid-beam structure with the span of 32.4 m ×33.2 m with irregular boundary condition of Chengde City Museum. The design method of prestressed concrete grid-beam structure is introduced, and the secondary moment of prestressing is calculated according to the balanced loads of prestressing considered in the design. The nominal stresses and ultimate moments of the concrete girders are calculated considering the secondary moments. The design method can be referenced in the designing of retardbonded prestressed concrete beams especially for that of the grid-beam structures.

关 键 词:缓粘结 预应力混凝土 井字梁 次弯矩 

分 类 号:TU757[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象