检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国给水排水》2008年第24期32-35,共4页China Water & Wastewater
摘 要:再生水回用管网规划是再生水回用规划中的重要组成部分。以昌平新城为例详细介绍了再生水回用管网的规划流程,包括数据库设计、管网几何网络构建、节点规划水量计算,并应用GIS与EPANET的耦合平台进行了再生水规划管网平差计算,且对平差结果进行了分析。Recycled water network planning is one of the most important parts of recycled water planning. Demonstrated by Changping New Town, the method to make this planning is presented, including geo-database design, recycled water network building and node planned flow rate calculation. The adjustment calculation of recycled water network is performed based on GIS and EPANET, and the calculation results are analyzed.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249