一桩两用在盖挖逆作地下工程中的应用  被引量:2

APPLICATION OF DUAL-PURPOSE PILE IN TOPDOWN CONSTRUCTION

在线阅读下载全文

作  者:耿建勋[1] 耿永常[1] 张克绪[1] 

机构地区:[1]哈尔滨工业大学土木工程学院,哈尔滨150090

出  处:《低温建筑技术》2008年第6期118-120,共3页Low Temperature Architecture Technology

摘  要:"一桩两用"技术是在基坑开挖过程中通过桩墙合一技术将排桩支护结构体系与地下室外墙形成复合结构,共同抵抗土压力。在盖挖逆作法施工中采用"一桩两用"技术,不仅可节约大量费用,而且使地下结构的外墙的受力状态更为合理。文中结合工程实例,应用大型通用有限元工程分析软件ANSYS根据弹性地基梁法对桩墙合一的复合结构进行了力学分析。The application of dual - purpose pile is a technique in which retaining piles are combined with outer walls of substructures to resist the eaah pressure. The application of dual - purpose pile in topdown construction can not only save costs, but also make the mechanic condition of substructure walls more rational. Based on real construction, this paper uses ANSYS to calculate the mechanic features of the combination of retaining piles and substructure walls during different construction stages. This paper calculated the mechanic features of the combination of retaining piles and substructure walls during different construction stages. The calculation results show this design can provide good economic benefit, which is a desirable reference for similar cnstruction.

关 键 词:一桩两用 盖挖逆作法施工 ANSYS 

分 类 号:TU941[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象