出 处:《水电站设计》2008年第4期15-18,共4页Design of Hydroelectric Power Station
摘 要:以某300m级的土石坝为例,在不同填筑层数下计算竣工期坝体沉降,研究填筑层数对300m级土石坝沉降量的影响。结果表明,当模拟填筑层数达到10层左右时,沉降量分布规律无明显变化,最大沉降量随着填筑层数的增加依然有减小的趋势;当模拟填筑层数达到25—30层以后,最大沉降量随填筑层数的变化才趋于稳定。对于300m级的土石坝,建议模拟填筑层数达到25~30层。This paper takes a 300m high embankment dam as an example to analyze the influence of simulated layer number on the settlement of 300m high embankment dams by simulating the dam stress and deformation during construction. The results illustrate that when simulated layer number exceed 10,the settlements distribution has no obvious change with the increasing in the simulated layer number,but the largest settlement still decreases gradually with the increasing placement layer number in it.When filled layer number reaches 25 to 30,the largest settlement changes little. Conseoucnfly, it is sussested that the simulated laver number for 300m high embankment dams should be 25 to 30.
分 类 号:TV641.1[水利工程—水利水电工程] TV311
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30