作 者:曾令安[1]
机构地区:[1]广东水电二局股份有限公司,广东增城511340
出 处:《施工技术》2008年第12期38-41,共4页Construction Technology
摘 要:滑道法是模袋混凝土施工的一门新技术,它具有施工速度快、质量好等特点。北江大堤加固达标工程由于水下抛石面整平效果好,决定采用滑道法进行深水模袋混凝土施工。正式施工前,进行了现场模袋混凝土充填试验,确定了各项施工参数。通过现场充填试验和搭接试验,确定了模袋系绳的高度,确保了模袋混凝土充填饱满。Slipway method is a kind of new technique about mould-bag concrete construction, which has some characteristics such as quickly construction speed and good quality etc. Beijiang dam strengthening engineering decided to adopt slipway method to construct decp-water mould-bag concrete because underwater riprap surface was very flat. Before comtruction, on-site monld-bag concrete filled test is done to determine all construction parameters. By on-site filled test and lapping test, the height of mould-bag tether is decided, which assures mould-bag concrete is filled fully and has good flatness.
分 类 号:TV544.925[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145