检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京国电华北电力工程有限公司,北京世面100011
出 处:《电力勘测设计》2008年第6期37-40,49,共5页Electric Power Survey & Design
摘 要:内蒙古大唐国际克什克腾发电厂发电项目是国家"十一五"863计划课题:1000MW褐煤超超临界锅炉关键技术研究的示范工程。我公司为《1000MW超超临界褐煤锅炉燃烧系统技术研究》子课题的二级子课题承担单位。褐煤具有碳化程度浅、水分高、灰分大、热值低等特点,本文介绍了大唐国际克什克腾电厂1000MW超超临界褐煤空冷机组中速磨煤机选型的情况。The Internal Mongolia Datang International Keshiketeng Power Plant Project is one of the subjects of the national " 11.5" 863 plan. It is the model project of the critical technology study of 1000MW supercritical brown coal-fired boiler. Our company is responsible for the second class sub-subject of the sub-subjects of " The combus- tion system technology study of the 1000MW supercritical brown coal-fired boiler" . The brown coal has the charac- teristics, like low carbonization, high water content, high ash content, low thermal value and so on. This article gives an introduction of the middle-speed Pulverizer Type Selection of the 1000MW supereritical brown coal-fired ACC (Air Cooling Condenser) Unit of Datang International Keshiketeng Power Plant.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.69