检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牟义慧[1]
出 处:《中国给水排水》2009年第2期90-92,共3页China Water & Wastewater
摘 要:在红旗泡泵站的建设中,成功应用了二管法垂直定喷截渗技术,详细介绍了施工方案及方法。工程实践证明,定喷截渗是处理土质均匀地层渗漏的最有效方法,施工速度较快、质量可靠、经济,值得在大型泵站工程中推广。During the construction of Hongqi Reservoir Pumping Station, the double-tube highpressure directional jet grouting technique was successfully applied. The construction scheme and methods are introduced amply. It is proved that the high-pressure directional jet grouting technique is an effective method to deal with seepage of uniform earth layer and it is worthy to be applied widely in the construction of large-scale pumping stations due to its rapid construction speed, reliable quality and economy.
分 类 号:TV543[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143